Mastering Korean Project Milestones: How to Manage Schedules Like a Pangyo Tech Lead
Phase 1: Empathy (Immersive Opening)
안녕하세요! 매일한글 에디터입니다. (Hello! This is your Daily Hangul editor.)
If you have ever watched the K-drama Start-Up or the cult-classic corporate drama Misaeng (미생), you already know the sheer, heart-pounding intensity of a Korean sprint review. Picture this: You are sitting in an airy glass meeting room in Pangyo—Korea’s Silicon Valley—surrounded by monitors displaying Gantt charts and Jira dashboards. Your project manager (PM) suddenly looks up, pushes their glasses up, and asks, “혹시 이번 스프린트 마일스톤, 일정대로 릴리즈 가능한가요?” (Can we release according to the milestone schedule for this sprint?).
Your heart skips a beat. You know the backend API is running two days late, but in Korean business communication, simply blurting out “아니요, 늦어요” (No, it’s late) can sound jarringly blunt, unprofessional, and dismissive of collective team effort. On the flip side, over-promising leads to grueling late-night “야근” (overtime) sessions and broken trust.
At the C1 advanced professional level, schedule management isn’t just about dates and numbers; it is an art form combining strategic diplomacy, tactful assertiveness, and deep corporate empathy. Many of our international enterprise learners struggle not because their grammar is broken, but because they lack the high-level collaborative phrasing that Korean managers expect when roadmaps shift. This field-tested guide is crafted to transform your professional Korean from stiff textbook lines into smooth, executive-ready communication. Let’s make sure your next milestone check-in earns nod of respect from your team lead.
Phase 2: Top 3 Core Expressions in Depth
1. 일정에 버퍼를 두다 (Iljeong-e beopeo-reul duda)
- Pronunciation: [Il-jeong-e beop-eo-reul doo-da] (Think of ‘buffer’ pronounced with a crisp Korean ‘eo’ sound, like ‘buff-uh’, followed by the gentle ‘doo-da’ like singing a soft melody).
- Meaning: Literally “To place a buffer in the schedule.” Nuance: Strategically building in safety margins or contingency time between milestones without appearing unprepared or lazy.
- K-Culture Moment: Seen in fast-paced tech dramas when an experienced senior developer pushes back against an overambitious CEO who wants to launch an app overnight.
- Editor’s Insight: Korean business culture moves at “빨리빨리” (hurry-hurry) speed, but senior stakeholders respect foresight. Using “버퍼를 두다” shows that you are anticipating edge cases and quality assurance rather than dragging your feet.
- Situation Spectrum: Casual ⚠️ | Semi-formal ✅ | Formal ✅
- 🤔 Think About It: How does setting contingency time in your native workplace culture differ from Korea, where public deadlines are viewed as sacred collective commitments?
2. 마일스톤을 재조정하다 (Ma-il-seu-ton-eul jae-jo-jeong-ha-da)
- Pronunciation: [Mah-il-seu-ton-eul jae-joh-jeong-hah-da] (The prefix ‘jae’ sounds like ‘J-air’ without the r, signaling re-calibration).
- Meaning: Literally “To readjust milestones.” Nuance: Diplomatically renegotiating project checkpoints based on data-driven bottlenecks rather than arbitrary delays.
- K-Culture Moment: The pivotal conference room scene in corporate dramas where team leads negotiate quarterly OKRs and timeline compromises on a whiteboard.
- Editor’s Insight: Never say “일정을 취소하다” (cancel schedule) or “연기하다” (postpone) in strategic meetings if you can avoid it. “재조정하다” frames the change as positive optimization and agile adaptation.
- Situation Spectrum: Casual 🚫 | Semi-formal ✅ | Formal ✅
- 🤔 Think About It: In many Western companies, schedule shifts are communicated directly via ticket updates. Why does Korean business discourse require sophisticated framing like “재조정” (re-coordination)?
3. 병목 현상을 해소하다 (Byeong-mok hyeon-sang-eul hae-so-ha-da)
- Pronunciation: [Byeong-mok hyeon-sang-eul hae-soh-hah-da] (Pronounce ‘byeong-mok’ like ‘pyeong-moak’—the ‘k’ sound halts softly in your throat).
- Meaning: Literally “To resolve the bottleneck phenomenon.” Nuance: Identifying and unclogging critical path constraints that threaten the project delivery date.
- K-Culture Moment: When a senior director walks into the war room with energy drinks and asks what specific blocker is holding back the team.
- Editor’s Insight: Using “문제” (problem) can inadvertently cast blame on a specific department. “병목 현상” depersonalizes the obstacle, treating it as an operational issue that the collective team can solve together.
- Situation Spectrum: Casual 🚫 | Semi-formal ✅ | Formal ✅
- 🤔 Think About It: How does shifting vocabulary from personal accountability to systemic bottlenecks foster corporate harmony in Korean workplaces?
Phase 3: Textbook Korean vs. Real Korean
Situation 1: Suggesting a schedule adjustment during a sprint planning
- 📖 교과서 한국어: 우리는 일정을 늦춰야 합니다. 마감일이 너무 빠릅니다.
(Uri-neun iljeong-eul neutchwoya hamnida. Magam-iri neomu ppareumnida.)
“We must delay the schedule. The deadline is too early.” - 🗣️ 진짜 한국어: 완성도를 담보하려면, 마일스톤 일정을 소폭 조율할 필요가 있어 보입니다.
(Wanseongdo-reul dambo-haryeomyeon, ma-il-seu-ton iljeong-eul sopok joyul-hal piryoga isseo boimnida.)
“To guarantee delivery quality, it appears necessary to slightly adjust the milestone schedule.” - 💡 왜 다를까?: Direct statements like “너무 빠릅니다” sound critical of leadership’s planning. C1 native speakers cushion their suggestions by stating the shared virtue (“완성도”, quality) first and softening the ending with “~보입니다” (it appears that).
Situation 2: Confirming alignment on a finalized target date
- 📖 교과서 한국어: 날짜를 결정했으니 모두 지키십시오.
(Naltja-reul gyeoljeong-haesseuni modu jikisipsio.)
“Since we decided the date, everyone obey it.” - 🗣️ 진짜 한국어: 3차 릴리즈 목표일로 픽스하고, 각 파트별 태스크 싱크 맞추시죠.
(Sam-cha ril-ri-jeu mokpyo-illo pik-seu-hago, gak pateu-byeol taeseukeu singkeu matchusijo.)
“Let’s lock in the target date for the 3rd release and sync task alignment across all teams.” - 💡 왜 다를까?: Modern Korean tech culture heavily integrates loanwords like “픽스하다” (to lock/fix) and “싱크 맞추다” (to sync), while using collaborative sentence endings like “~시죠” to inspire ownership instead of issuing top-down commands.
Phase 4: K-Culture Deep Dive & Non-Verbal Manners
4-1. 눈치 (Nunchi) & Gestures: Delivering Schedule Updates Gracefully
When presenting project timelines in Korean corporations, your body language carries equal weight to your slides. When addressing milestone shifts:
1. The Subtle Head Tilt and Pen Pause: If you must flag a delay, do not lean back cross-armed. Lean forward slightly, place your tablet stylus or pen down on the table, and deliver your assessment with a measured, reflective tone.
2. Hand Framing: When pointing at Gantt charts on a screen, use an open palm facing upward rather than an index finger. Pointing with a finger can feel accusatory toward the team responsible for that phase.
3. Cushioning Breathing (쿠션 호흡): Before stating that a milestone is unfeasible, pause for one second and inhale lightly. This micro-gesture signals that you have evaluated the matter deeply rather than simply rejecting the timeline.
4-2. Cultural Code Analysis: Pangyo Agile vs. Traditional Yeouido Deadlines
In traditional sectors like finance (Yeouido) or heavy industries, deadlines are historically treated as rigid directives handed down from top executives. However, in Korea’s booming IT hubs like Pangyo and Teheran-ro, the adoption of Agile and Scrum frameworks has modernized this relationship.
Yet, a unique Korean hybrid culture has emerged: while tech teams operate in two-week sprints, the commitment to company milestones still carries strong communal duty. Missing a milestone isn’t merely a sprint metric failure; it impacts downstream teams who may have scheduled marketing rollouts, press releases, or partner events. Advanced business Korean reflects this interdependence—you must always demonstrate that you understand how your schedule adjustments ripple across the wider organization.
Phase 5: Real-Life Roleplay Scenario
Setting: A modern glass meeting room at a SaaS company in Pangyo. 10:30 AM sprint alignment session.
Characters:
* 박 팀장 (Lead Park): A sharp, results-driven Project Director with high standards.
* 알렉스 (Alex): C1-level Senior Technical Lead managing cross-functional milestones.
Turn 1
* 박 팀장: 알렉스 님, 다음 주 예정된 알파 버전 배포 마일스톤, 현재 진척도 기준으로 무리 없으신가요?
(Alex-nim, da-eum ju yejeong-doen alpa beojeon baepo ma-il-seu-ton, hyeonjae jincheokdo gijun-euro muri eopseusingayo?)
“Alex, regarding the Alpha release milestone scheduled for next week, are we on track based on current progress?”
🎭 안경을 고쳐 쓰며 스프린트 번다운 차트를 면밀히 응시한다.
Turn 2
* 알렉스: 핵심 기능 구현은 90% 이상 완료되었으나, 외부 결제 모듈 연동에서 예기치 못한 병목이 발생했습니다.
(Haeksim gineung guhyeon-eun gusip peosenteu isang wanryo-doe-eosseuna, oebu gyeolje modyul yeondong-eseo yegichi mothan byeongmogi balsaenghaesseumnida.)
“Core feature implementation is over 90% complete, but an unexpected bottleneck occurred during external payment module integration.”
🎭 차분하게 노트북 화면의 연동 로그 다이어그램을 띄우며 설명한다.
Turn 3
* 박 팀장: 결제 모듈 쪽 이슈라면 QA 일정 전체가 밀릴 수도 있겠네요. 해결 방안이 있습니까?
(Gyeolje modyul jjok issyuramyeon QA iljeong jeonchega millil sudo itgenneyo. Haegyeol bang-ani isseumnikka?)
“If it’s an issue with the payment module, the entire QA timeline could get pushed back. Do we have a resolution plan?”
🎭 턱을 괴며 조금 심각한 표정으로 일정표를 다시 훑어본다.
Turn 4
* 알렉스: 협력사 테크팀과 핫라인을 열어 오늘 오후까지 1차 픽스를 받기로 협의했습니다. 다만 안정성 검증을 위한 최소한의 버퍼는 확보해야 합니다.
(Hyeopryeoksa tekeutim-gwa hatrain-eul yeoreo oneul ohu-kkaji il-cha pikseu-reul batgiro hyeobui-haesseumnida. Daman anjeongseong geomjeung-eul wihan choesohan-ui beopeo-neun hwakbo-haeya hamnida.)
“We agreed to open a hotline with the vendor team to receive a hotfix by this afternoon. However, we must secure a minimal buffer for stability testing.”
🎭 흔들림 없는 눈빛으로 현실적인 대안을 제시한다.
Turn 5
* 박 팀장: 그렇다면 QA 착수를 이틀 뒤로 순연하는 게 불가피하다는 말씀이시죠?
(Geureotdamyeon QA chaksu-reul iteul dwiro sun-yeonhaneun ge bulgahpi-hadaneun malsseum-isijyo?)
“So you are saying that pushing back the QA kickoff by two days is unavoidable?”
🎭 회의용 펜을 가볍게 쥐며 알렉스의 다음 말을 기다린다.
Turn 6
* 알렉스: 네, 무리하게 빌드를 넘기기보다는, 마일스톤을 이틀 재조정하여 결제 플로우를 완벽히 검증한 후 진행하는 것이 리스크를 최소화하는 길입니다.
(Ne, muri-hage bil-deu-reul neomgigi-bodaneun, ma-il-seu-ton-eul iteul jae-jo-jeong-hayeo gyeolje peul-rou-reul wanbyeokhi geomjeung-han hu jinhaenghaneun geosi riseukeu-reul choesohwahaneun girimnida.)
“Yes, rather than forcing a build handover, readjusting the milestone by two days to thoroughly verify the checkout flow is the best way to minimize operational risk.”
🎭 손바닥을 펼쳐 화면의 리스크 분석표를 가리킨다.
Turn 7
* 박 팀장: 타당한 판단이네요. 운영 조직과 마케팅 팀에는 제가 바로 변경 사항을 공유하고 일정을 조율해 두겠습니다.
(Tadanghan pandan-ineyo. Unyeong jojik-gwa maketing tim-eneun jega baro byeongyeong sahang-eul gong-yuhago iljeong-eul joyul-hae dugetseumnida.)
“That is a sound judgment. I will immediately share the updates with Operations and Marketing to align schedules.”
🎭 고개를 끄덕이며 메모장에 수정된 마일스톤을 기입한다.
Turn 8
* 알렉스: 배려해 주셔서 감사합니다. 오늘 퇴근 전까지 수정된 간트 차트와 마일스톤 로드맵을 슬랙 채널에 업로드하겠습니다.
(Baeryeo-hae jusyeoseo gamsahamnida. Oneul toegeun jeon-kkaji sujeong-doen ganteu chateu-wa ma-il-seu-ton rodeumaep-eul seullaek chaeneol-e eopeurodeu-hagetseumnida.)
“Thank you for understanding. I will upload the revised Gantt chart and milestone roadmap to the Slack channel before end of day.”
🎭 공손히 고개를 숙이며 파트너십에 대한 감사를 표한다.
🔀 Interactive Decision Point
Imagine Team Lead Park asks Turn 5, but you feel that working over the weekend without schedule adjustment might also be technically possible. How do you respond?
- Option A: “주말에 밤새워서라도 원래 일정대로 무조건 맞추겠습니다!” (We will definitely pull all-nighters over the weekend to hit the original schedule at all costs!)
Feedback (Bad): While passion is valued, promising blind overtime without guaranteed quality creates severe delivery risks and marks you as an inexperienced planner. - Option B: “팀장님, 이미 버그가 터졌는데 일정을 어떻게 지킵니까? 미뤄야죠.” (Lead Park, a bug already broke out, how can we keep the schedule? We must postpone it.)
Feedback (Risk): Extremely defensive and confrontational. Placing blame and speaking informally damages trust in senior cross-functional relations. - Option C: “주말 작업을 통한 만회 방안도 검토했으나, 휴먼 에러 발생 위험이 큽니다. 이틀간의 버퍼를 확보하고 완성도를 높이는 방안을 제안드립니다.” (We reviewed weekend crunch recovery, but the risk of human error is high. I recommend securing a two-day buffer to maximize delivery quality.)
Feedback (Best): Flawless C1 strategy. Acknowledges alternative scenarios, provides risk-benefit analysis, and protects team well-being while centering quality.
Phase 6: 10-Second Emotion Shadowing Drill
Practice these high-frequency project milestone sentences using natural intonation and pauses marked with /.
[💼 단호하지만 정중하게 - Firm yet respectful]
리스크를 선제적으로 예방하기 위해 / 마일스톤 일정에 최소 사흘간의 버퍼를 / 확보해야 합니다.
(Riseukeu-reul seonje-jeog-euro yebanghagi wihae / ma-il-seu-ton iljeong-e choeso sahreul-gan-ui beopeo-reul / hwakbo-haeya hamnida.)
“To preemptively prevent risks / we must secure a buffer of at least three days / in the milestone schedule.”-
[🤔 신중하고 배려심 넘치게 - Prudent and collaborative]
이대로 일정을 강행할 경우 / QA 단계에서 병목 현상이 가중될 우려가 / 있습니다.
(Idaero iljeong-eul ganghaenghal gyeong-u / QA dangye-eseo byeongmok hyeonsang-i gajung-doel uryeoga / itseumnida.)
“If we push forward with the schedule as is / there are concerns that bottlenecks will intensify / during the QA phase.” -
[🤝 신뢰감을 주는 리더십 - Trustworthy executive tone]
금주 금요일까지 / 핵심 마일스톤을 성공적으로 클리어하고 / 다음 스프린트 싱크를 / 맞추겠습니다.
(Geumju geumyo-il-kkaji / haeksim ma-il-seu-ton-eul seong-gong-jeog-euro keul-li-eo-hago / da-eum seupeurinteu singkeu-reul / matchugetseumnida.)
“By this Friday / we will successfully clear the core milestone / and align the sync / for the next sprint.”
Phase 7: K-Culture Mini Dictionary
-
납기 (Napgi)
Translation: Delivery date / Due date.
Usage: Derived from Hanja (納期), commonly used in contracts and B2B tech deliverables. E.g., “납기일 준수는 고객사 신뢰의 핵심입니다” (Meeting the delivery deadline is key to client trust). -
딜레이 (Deillei)
Translation: Delay.
Usage: Ubiquitous in Korean agile software engineering. Instead of using the formal Sino-Korean “지연” (jiyeon), tech leads routinely say, “일정에 딜레이가 발생하지 않도록 트래킹해 주세요” (Please track to ensure no delay occurs in the schedule). -
싱크를 맞추다 (Singkeu-reul matchuda)
Translation: To sync up / align status.
Usage: Taken from English ‘sync’. Used when team dependencies need cross-verification. E.g., “디자인 파트와 주간 싱크 맞춰서 진행 상황 확인합시다” (Let’s sync weekly with the design team to check progress). -
스케줄을 픽스하다 (Seukejureul pikseu-hada)
Translation: To freeze / lock down a schedule.
Usage: Once team leads negotiate milestones, they declare it “픽스” (fixed). Changing dates after they are officially “fixed” requires formal stakeholder justification.
Phase 8: Professional Expats & Travelers Survival Kit
Survival Expressions TOP 3 for Fast-Paced Korean Workplaces
- 일정 조율 가능한가요? (Iljeong joyul ganeunghangayo?)
Pronunciation: [Il-jeong joh-yool gah-neung-hahn-gah-yoh?]
Pro Tip: The most polite, friction-free way to ask if an upcoming meeting or deliverable timeline can be shifted. - 공유 주신 타임라인 확인했습니다. (Gong-yu jusin taimrain hwaginhaesseumnida.)
Pronunciation: [Gong-yoo joo-shin tah-im-lah-in hwah-gin-haet-seum-nee-dah.]
Pro Tip: Perfect acknowledgement phrase when someone pings you on KakaoWork or Slack with a project timeline document. - 마감 기한을 엄수하겠습니다. (Magam gihaneul eomsuhagetseumnida.)
Pronunciation: [Mah-gahm gee-hahn-eul eom-soo-hah-get-seum-nee-dah.]
Pro Tip: Use this to project ironclad dependability when stakeholders confirm your project milestone.
Editor’s Travel & Remote Work Note
Working out of a co-working space in Gangnam or Pangyo? Navigating Korean project rhythms requires seamless digital coordination. Make sure you install the essential Korean office toolset:
* Set up seamless commute routing via 네이버 지도 앱 다운로드 to ensure you never arrive late to milestone steering committees.
* Install and configure enterprise messengers like KakaoWork or Dooray, as Korean project teams manage agile milestone tickets and emergency blockers through mobile push notifications rather than long email threads.
Phase 9: “한 발 더 깊이” (Deep Cultural Reflection)
In Korean corporate discourse, a milestone is never simply an individual’s personal deadline; it is an organic link in a shared collective chain called “한 배를 타다” (being in the same boat). When you manage a project schedule in Korea, expressing respect for the collective effort matters far more than proving that your own code or module was finished on time. Admitting that your team requires a buffer is not interpreted as incompetence, provided you frame the buffer as a shield protecting the entire organization’s quality and reputation. How does the balance between individual autonomy and collective responsibility shape schedule negotiations in your home country?
💬 Your Turn: In the comments below, share how you would explain a two-day project delay to your Korean team manager using the phrase “완성도를 담보하기 위해…” (To guarantee quality…)! I will personally review and provide C1-level feedback on your phrasing.
Phase 10: FAQ & Avoiding Misunderstandings
Q: Can I use the English word “Deadline” directly in Korean project meetings?
A: Yes! Korean tech and corporate environments use “데드라인” (dedeurain) and “마감일” (magamil) interchangeably. However, in formal documentation and presentation decks to executives, use Sino-Korean terms such as “납기일” (due date) or “완료 목표일” (completion target date).
Q: What is the polite way to reject an unrealistic milestone set by senior leadership?
A: Avoid direct negation like “그 일정은 불가능합니다” (That schedule is impossible). Instead, frame your response around risk assessment: “해당 일정으로 진행할 경우, QA 품질 검증 과정에서 기술적 리스크가 발생할 가능성이 높습니다. 마일스톤을 단계별로 분할하는 방안을 제안드려도 되겠습니까?” (If we proceed with that schedule, technical risks are likely to arise during QA testing. May I propose splitting the milestones into phases?).
Q: What does “일정을 당기다” mean in sprint meetings?
A: “일정을 당기다” (iljeong-eul danggida) literally means “to pull the schedule closer,” meaning to advance or move the target date earlier. Its antonym is “일정을 미루다 / 늦추다” (to push back / delay the schedule).
🚨 Common Mistakes (흔한 실수 TOP 3)
- Saying “일정이 죽었어요” for a missed deadline:
Mistake: Translating the English idiom “the deadline is dead/killed.”
Correct Action: Say “일정이 지연되었습니다” (The schedule has been delayed) or “데드라인을 넘겼습니다” (We surpassed the deadline). - Using “타임테이블” (Timetable) instead of “일정표” or “로드맵”:
Mistake: Calling a complex software delivery schedule a “타임테이블” (often sounds like a train schedule).
Correct Action: Use “마일스톤 로드맵” (milestone roadmap) or “상세 일정표” (detailed schedule). - Dropping cushioning endings when requesting schedule extensions:
Mistake: Saying “마일스톤을 연기해 주세요” (Please postpone the milestone) which sounds like an imperative demand.
Correct Action: Soften the request: “마일스톤 일정 조율을 긍정적으로 검토해 주실 수 있을까요?” (Could you favorably consider adjusting the milestone schedule?).
Phase 11: Action Missions
- 🥉 Bronze Mission (Solo Shadowing): Read aloud Alex’s responses from Phase 5 three times. Record your voice on your smartphone and check whether your intonation sounds confident, measured, and calm.
- 🥈 Silver Mission (Community Sharing): Leave a comment in our Daily Hangul study Slack or in the comment box below answering: “프로젝트 일정에서 가장 중요한 마일스톤은 무엇인가요?” (What is the most important milestone in your project?) using the word 병목 현상 (bottleneck).
- 🥇 Gold Mission (Real-World Application): In your next real-world sprint meeting or mock work session with Korean colleagues, incorporate the phrase “완성도를 담보하기 위해 버퍼를 두다” naturally during timeline discussions.
- 🎮 K-Culture Mission: Watch an episode of the Korean drama Start-Up (스타트업) or Search: WWW (검색어를 입력하세요 WWW). Jot down every time characters use loanwords like “스케줄”, “마일스톤”, or “릴리즈”, and note how their politeness levels shift depending on whether they are in the dev room or the boardroom.
Phase 12: Interactive Quiz Challenge
Test your project management Korean mastery! Choose your answers and reveal the explanations below.
1. Situation Judgment
Your project is falling 3 days behind schedule because of a third-party server outage. During the weekly status meeting with Director Kim, which of the following responses is the most professional (C1 level)?
* A) “서버 회사 잘못이라 우리 팀은 잘못 없습니다. 일정 미룹니다.”
* B) “외부 인프라 이슈로 일시적 병목이 발생하여, 납기 품질을 담보하고자 마일스톤을 소폭 재조정하고자 합니다.”
* C) “일정 못 지키겠으니 다음 달에 다시 회의하시죠.”
2. Fill-in-the-Blank
Complete the sentence with the appropriate professional term:
“프로젝트 후반부의 리스크를 방지하기 위해 QA 단계에 충분한 ( )를 둘 필요가 있습니다.”
* A) 간식 (Gansik)
* B) 버퍼 (Beopeo)
* C) 불만 (Bulman)
3. True / False Cultural Check
- Statement: In a Korean company, saying “알아서 하세요” (Do as you please) during schedule adjustments is considered a respectful delegation of authority to your project lead. (True / False)
👉 정답 및 해설 보기 (Click to Reveal Answers)
Quiz Explanations
- 정답: B
해설: Option B objectively identifies the issue (“외부 인프라 이슈로 일시적 병목”), states the clear objective of maintaining quality (“납기 품질을 담보하고자”), and politely proposes an adjustment (“소폭 재조정하고자 합니다”). Option A pushes blame aggressively, while Option C is utterly rude and dismissive. -
정답: B (버퍼)
해설: The sentence requires the term for strategic safety time or margin. “버퍼를 두다” is the exact executive collocation for building buffer time into project phases. -
정답: False
해설: “알아서 하세요” translates literally to “do as you see fit,” but in Korean workplaces, it carries a cold, passive-aggressive tone equivalent to “I wash my hands of this; do whatever you want.” Instead, say: “팀장님의 판단에 일임하겠습니다” (I leave the judgment to the team lead’s expertise) or “편하신 방향으로 결정해 주시면 따르겠습니다” (We will follow whichever direction you decide).